PAROC Hvac Section GreyCoat T and PAROC Hvac Bend GreyCoat T is non-combustible stone wool pipe insulation for thermal and condensation insulation of pipework in buildings. It has a reinforced grey aluminium foil facing and tape in the longitudinal seam which prevents condensation and gives a quick installation.

General instructions

  • During the installation, both the object to be insulated and the insulation material should be at a minimum temperature of +10 Celsius.
  • Allow the temperature of the insulating material to adjust to the ambient installation temperature.
  • Always store the GreyCoat tape at room temperature.
  • Check that the surfaces to be joined with tape are clean and dry.
  • Ensure that pipe section seams are tight but without extra tension. The same applies at supports and other projecting parts.

Follow these instructions to insulate straight pipes:

Installation PAROC Hvac Section Grey Coat Clean the surface carefully. 
Installation PAROC Hvac Section Grey Coat Remove the release paper and put pressure on the tape with a spatula.

In order to secure the installation, additional fasteners are required.

Option 1 - Galvanized wire

Installation PAROC Hvac Section GreyCoat Put galvanized wire around the section.
Installation PAROC Hvac Section GreyCoat Lock the wire. Three wires per section are needed.

Option 2 - Galvanized wire, spiral winding

Installation PAROC Hvac Section GreyCoat

Spiral winding of the galvanized wire. Lock the wire one time per section.

Option 3 – Bands

Installation PAROC Hvac Section GreyCoat There are different plastic or metallic bands available that can be used.
Installation PAROC Hvac Section GreyCoat Three bands per section are recommended. Do not apply the bands with too much force, since the facing might break.

Option 4 - Tapelock

Installation PAROC Hvac Section GreyCoat Put the tape around the section.  
Installation PAROC Hvac Section GreyCoat Use the “tapelock” method where the tape is fastened glue against glue.
Installation PAROC Hvac Section GreyCoat Fold the tape so that the glue side is attached to the facing.
Installation PAROC Hvac Section GreyCoat For cold installations where the facing is used as a vapour barrier,
Installation PAROC Hvac Section GreyCoat you need to tape all circumferential joints with Paroc GreyCoat tape.
Installation PAROC Hvac Section GreyCoat Use the “tapelock” method where the tape is fastened glue against glue.
Installation PAROC Hvac Section GreyCoat Fold the tape so that the glue side is attached to the facing.
Tape all longitudinal joints with PAROC GreyCoat Tape
Installation PAROC Hvac Section GreyCoat Cut the sections to fit.
Installation PAROC Hvac Section GreyCoat Tape the joints.
Installation PAROC Hvac Section GreyCoat Cover the insulation ends with GreyCoat flange.
Installation PAROC Hvac Section GreyCoat  
Installation PAROC Hvac Section GreyCoat Secure the GreyCoat flange with galvanized wire.
Installation PAROC Hvac Section GreyCoat  

Follow these instructions to insulate pipe bends:

Option 1 - Cutting segments

Installation PAROC Hvac Section GreyCoat Cut segment from the section.
Installation PAROC Hvac Section GreyCoat Apply the segments on the bend and tape the joints.

Option 2 – PAROC Hvac Bend GreyCoat T

Installation PAROC Hvac Section GreyCoat Apply PAROC Hvac Bend GreyCoat T on the straight pipe.  
Installation PAROC Hvac Section GreyCoat Apply PAROC Hvac Bend GreyCoat T on the straight pipe.
Installation PAROC Hvac Section GreyCoat
Installation PAROC Hvac Section GreyCoat

Continue the pipe insulation.