option2-Installation of PAROC Hvac Sections GreyCoat T

PAROC Hvac Section GreyCoat T is a non-combustible stone wool pipe section for thermal and condensation insulation of pipework in buildings. It has a reinforced grey aluminium foil facing and tape in the longitudinal seam which prevents condensation and gives a quick installation.

General instructions

  • During the installation, both the object to be insulated and the insulation material should be at a minimum temperature of +10 Celsius. Allow the temperature of the insulating material to adjust to the ambient installation temperature.
  • Always store the GreyCoat tape at room temperature.
  • Check that the surfaces to be joined with tape are clean and dry.
  • Ensure that pipe section seams are tight but without extra tension. The same applies at supports and other projecting parts.

Follow these insctructions to install PAROC HVAC Pipe Section GreyCoat T:

Apply the section

Securing the section 

Taping all joints

Insulating bends 

Insulation of T-joints and covering of insulation ends

Apply the section

 
Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat 
Clean the surface carefully. Remove the release paper and put pressure on the tape with a spatula.

 

Securing the section

In order to secure the installation, additional fasteners are required.

Option 1 - Galvanized wire

Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat 
 Put galvanized wire around the section. Lock the wire. Three wires per section are needed.

Option 2 - Galvanized wire, spiral winding

Installation PAROC Hvac Section Grey Coat

Spiral winding of the galvanized wire. Lock the wire one time per section. 

Option 3 – Bands

Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat 
There are different plastic or metallic bands available that can be used. Three bands per section are recommended. Do not apply the bands with too much force, since the facing might break.

Option 4 - Tapelock

Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat
Put the tape around the section. Use the “tapelock” method where the tape is fastened glue against glue. Fold the tape so that the glue side is attached to the facing.

Taping all joints

 Installation PAROC Hvac Section Grey Coat Installation PAROC Hvac Section Grey Coat 
 For cold installations where the facing is used as a vapour barrier, you need to tape all circumferential joints with Paroc GreyCoat tape.
 

 Installation PAROC Hvac Section Grey Coat Installation PAROC Hvac Section Grey Coat 
Use the “tapelock” method where the tape is fastened glue against glue. Fold the tape so that the glue side is attached to the facing.

Insulating bends

Option 1 - Cutting segments

 Installation PAROC Hvac Section Grey Coat Installation PAROC Hvac Section Grey Coat 
Cut segment from the section. Apply the segments on the bend and tape the joints.
 

Option 2 – PAROC Hvac Bend GreyCoat T

 Installation PAROC Hvac Section Grey Coat Installation PAROC Hvac Section Grey Coat   Installation PAROC Hvac Section Grey Coat
Apply PAROC Hvac Bend GreyCoat T on the straight pipe. Apply PAROC Hvac Bend GreyCoat T on the straight pipe.

Installation PAROC Hvac Section Grey Coat

Continue the pipe insulation.

Insulation of T-joints and covering of insulation ends

 Installation PAROC Hvac Section Grey Coat Installation PAROC Hvac Section Grey Coat 
Cut the sections to fit. Tape the joints.
 Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat
Cover the insulation ends with GreyCoat flange.  
 Installation PAROC Hvac Section Grey Coat  Installation PAROC Hvac Section Grey Coat
 Secure the GreyCoat flange with galvanized wire.