Installation guidelines for log wall renovation
Remove old facade and wind protection slab. Seal the gaps and repair mouldy or moisture-damaged structures.
|
|
Installation guidelines for partitions
To achieve the stated value, make the general structure and connections according to the outer layer and/or the batten supplier’s instructions.
|
|
Installation guidelines for pitched roofs
Fit PAROC eXtra insulation from the upper side of the roof. Start heating only after the air and vapour barrier has been installed. This prevents water vapour from being unnecessarily transported through the structure and possibly condensing against the outer roof.
|
|
Installation guidelines for pitched roofs - building a warm attic
Inspect the condition of the old loft (insulation and structures). If the old construction and insulation are in good condition, add new insulation layers on top of it. If they are wet or mouldy , remove them.
|
|
Installation guidelines for pitched roofs - renovation
Inspect the condition of the old loft (insulation and structures). If the old structure and insulation are in good condition, add new insulation layers on top of it. If they are wet or mouldy, remove them.
|
|
Installation guidelines for ventilated facades
Install slabs tight to the masonry wall. Use one layer of PAROC WPS 1n, or multi-layers with PAROC eXtra and PAROC WPS 3n.
|
|
Installation guidelines for ventilated floors
Remove the floor and inspect the condition of the old insulation and structure. If the old structure and insulation are in good condition, just add new insulation layers on top of them.
|