Search 
 
About UsBuilding InsulationTechnical InsulationPanel SystemPARAFONĀ® AcousticsMarineContacts
Panel System
Systems
Products
AST quality
Technical info
Service
Installation
LiftAids
Use and maintenance
References
Documentation
Brochures and other download material
Contact us
Installation of PAROC panels


Installation of PAROC panels is fast and easy in almost all weather conditions. The purposeful design and the low weight of the panels add to the convenience. The panels come completely finished so no wet trades are needed after installation.

Installation drawings with coded panels and package locations simplify the planning of activities on the building site. Detailed installation instructions, appropriate accessories, project specific details and start-up training on site make installation faster.

Panels in installation order

Based on architectural drawings Paroc submits to the customer panel drawings on all panels including cutting lengths. At the same time this generates the required installation and package drawings. The panels are packed in installation order in durable packages. If required, special-cut panels can be made in the factory.

Safe lifting equipment

Safe and tested installation equipment available on rental basis makes installation more efficient. With the handy and patented LiftAids PAROC panels can be lifted in horizontal and vertical installations.

Installation partners

Paroc sales offices can recommend local installation companies, who have received training and also have long practical experience in the installation of PAROC panels.

 

  

Additional information

Installation Guide gives
detailed installation Instructions.

Details
PAROC panels have to be installed according to the project specific details. Our standard details are availeble in dwg-format.

LiftAids
are specific lifting tools for PAROC panels.

Use and Maintenance Guide presents for instance how to clean and repair panels.

Terms and Conditions of Web Use