Search 
 
About UsBuilding InsulationTechnical InsulationPanel SystemAcousticsMarineContacts
Energy efficiency
Fire Safe Systems
Why stone wool?
Solutions
Introduction renovation
Products
Handling
References
Official documentation
Brochures and other download material
Contact us
FAQ
 Thin rendering insulation PreWIS* I and II

Rendering insulation methods using panel technology

New rendering methods designed especially for precast concrete panel factories. An excellent solution for winter-time construction, as the insulation is installed at the factory and fixed to the concrete away from harsh weather conditions.

* Prefabricated Wall Insulation System

The structure has been tested at Tampere University of Technology (statements 1279/2003 and 1399/2005). The study provides special instructions for the panel installation, possible fixings etc. 

Additional information: jukka.sevon@paroc.com

 More information

 

 

 

 

 

 

 

<< Back to selection

PreWIS I
- prefabricated lamella insulation structure (can be weather-proofed)

        

    Installation at the factory

    • concrete/precast concrete panel 
    • PAROC FAL 1 insulation fixed to concrete during casting on-site installation 
    • weather-proofing

         On-site installation

    • grouting+plastic-coated fibreglass mesh for reinforsement 
    • coating

PreWIS II
- prefabricated lamella insulation structure (with grouting, reinforcement and rendering)


      Installation at the factory

  • concrete/precast concrete panel
  • PAROC FAL 1 insulation fixed to concrete during casting
  • grouting+plastic-coated fibreglass mesh for reinforcement, grouting and rendering

      On-site installation

  • coating and seams

Terms and Conditions of Web Use